Families participating in the community characterization for recurrent flooding.
Institutional source: La Vega–Bijao case file.TRANSPARENCY · IMPACT INDICATORS
Indicators showing evidence-backed results, not inflated figures.
Fundación Sonrisas Sostenibles publishes only indicators that can be linked to records, case files, characterization exercises or institutional actions. Future targets are presented separately and are not counted as achieved results.
INDICADORES VERIFICABLES
Lo que hoy podemos respaldar.
These values correspond to information already documented within the Foundation's institutional processes.
La Vega and Bijao were included in the community characterization exercise.
No representa cobertura total del municipio.I.E. 20 de Julio and Colegio Interamericano within the Corredor Escolar Seguro project.
Prioritization does not equal completed intervention.Wastewater, Corredor Escolar Seguro, El Bagre Siembra Futuro and flooding characterization.
Todos cuentan con trazabilidad documental organizada.DOCUMENTED MANAGEMENT
Indicadores de proceso.
While several projects advance toward implementation, we also measure the capacity to identify needs, formalize institutional actions and maintain follow-up.
The flooding case file includes completed fieldwork and subsequent institutional management.
The wastewater case records actions before the Municipality, Municipal Planning Office and Aguas de El Bagre S.A. E.S.P.
El Bagre Siembra Futuro records a formal submission, institutional call and coordination roundtable.
Corredor Escolar Seguro has two prioritized institutions and documented traceability.
WHAT WE DO NOT COUNT YET
Targets are not results.
These figures belong to the program and project planning horizon and should not be interpreted as impact already achieved.
2,500 trees
Initial target for El Bagre Siembra Futuro. It will be reported as a result only when verifiable planting and follow-up records exist.
Tejiendo Sonrisas
Participating families, contributions and activity days will be counted after their planned implementation and corresponding documentation.
METHODOLOGY
How our indicators will evolve.
As projects mature, each indicator will include a baseline, target, result, evidence and update date.
Documented initial situation.
Resultado esperado definido previamente.
Valor realmente alcanzado.
Supporting evidence that makes the data verifiable.
Date and current status of the indicator.